Can I run multiple jobs at the same time?
Posted: Thu Jan 07, 2010 4:05 pm
I'm using AISbackup a/o to synchronize the files on our NAS to a portable USB drive to take home at night.
Now I need to do this for another NAS to a different USB drive at the same time.
As far as I can tell my computer and network connections have enough performance/resources left to do this concurrently. However, when I attempt to start AISbackup when it is already started, it will switch to the currently active session. When I try to start AISbackup twice (with different jobs) from the Task Scheduler, one of them will be queued.
Is it possible to run 2 AISbackup jobs at the same time at the same computer? If so, how?
The computer is running Windows 7 professional, 64-bit
Now I need to do this for another NAS to a different USB drive at the same time.
As far as I can tell my computer and network connections have enough performance/resources left to do this concurrently. However, when I attempt to start AISbackup when it is already started, it will switch to the currently active session. When I try to start AISbackup twice (with different jobs) from the Task Scheduler, one of them will be queued.
Is it possible to run 2 AISbackup jobs at the same time at the same computer? If so, how?
The computer is running Windows 7 professional, 64-bit