Can I run multiple jobs at the same time?

Use this forum for help with AISBackup
Post Reply
beheer
Posts: 26
Joined: Thu Jan 24, 2008 9:18 am

Can I run multiple jobs at the same time?

Post by beheer »

I'm using AISbackup a/o to synchronize the files on our NAS to a portable USB drive to take home at night.

Now I need to do this for another NAS to a different USB drive at the same time.

As far as I can tell my computer and network connections have enough performance/resources left to do this concurrently. However, when I attempt to start AISbackup when it is already started, it will switch to the currently active session. When I try to start AISbackup twice (with different jobs) from the Task Scheduler, one of them will be queued.

Is it possible to run 2 AISbackup jobs at the same time at the same computer? If so, how?

The computer is running Windows 7 professional, 64-bit
Barry
Site Admin
Posts: 1529
Joined: Tue Aug 20, 2002 3:16 pm

AISBackup concurrent running

Post by Barry »

Concurrent running of AISBackup is disabled because some files are shared, however I think that you could issue non-interactive backup jobs under different user account names to achieve this - Please let me know if this works.

Barry
Post Reply