Batch Backup
Posted: Wed Nov 28, 2007 4:20 am
I have about 6 backup jobs that need to be run over night. I would like to start Job #2 as soon as Job #1 stops, #3 as soon as #2 stops, etc.
I've tried different ways including a batch file and trying to run the next job in the run after section, but niether worked. Any ideas.
Thanks
I've tried different ways including a batch file and trying to run the next job in the run after section, but niether worked. Any ideas.
Thanks