Batch Backup

Use this forum for help with AISBackup
Post Reply
ackster
Posts: 7
Joined: Thu Jul 07, 2005 6:03 pm

Batch Backup

Post by ackster »

I have about 6 backup jobs that need to be run over night. I would like to start Job #2 as soon as Job #1 stops, #3 as soon as #2 stops, etc.

I've tried different ways including a batch file and trying to run the next job in the run after section, but niether worked. Any ideas.

Thanks
Barry
Site Admin
Posts: 1529
Joined: Tue Aug 20, 2002 3:16 pm

Auto running multiple backup jobs

Post by Barry »

Use the Tools / Auto Running AISBackup option and Choose a job drop down list multiple times in the order you want to run the jobs, then click MS Task Scheduler to set-up the schedule. Enter the time of the schedule and leave the other parameters to default values to run the job under the current logged on user account, i.e. click OK.

Barry
ackster
Posts: 7
Joined: Thu Jul 07, 2005 6:03 pm

Post by ackster »

I'll give it a try tonight. Thanks for the quick reply.
Post Reply