I have about 6 backup jobs that need to be run over night. I would like to start Job #2 as soon as Job #1 stops, #3 as soon as #2 stops, etc.
I've tried different ways including a batch file and trying to run the next job in the run after section, but niether worked. Any ideas.
Thanks
Batch Backup
Auto running multiple backup jobs
Use the Tools / Auto Running AISBackup option and Choose a job drop down list multiple times in the order you want to run the jobs, then click MS Task Scheduler to set-up the schedule. Enter the time of the schedule and leave the other parameters to default values to run the job under the current logged on user account, i.e. click OK.
Barry
Barry