Page 1 of 1
Changing notification
Posted: Sat Apr 17, 2004 5:17 pm
by Hughg
Barry -- is there a way of changing the notification mode (e.g. from displaying a message reporting that all went well with a scheduled backup, to displaying a message if it didn't) for existing backup jobs?
Hugh
Chaninging run-time notification message
Posted: Tue Apr 20, 2004 10:11 am
by Barry
The run time parameter for any completion message is M the run time parameter for a failure message only is F These parameters may be changes either by re-setting up the jobs via Tools / Autorunning AISBackup or by altering the AISBackup task directly in Microsoft Task Scheduler: (1.9) Tools / Show MS Task Scheduler / Right Click the job icon / Properties / Task / change the M after | to F.
Barry
Posted: Tue Apr 20, 2004 11:34 am
by Hughg
Thanks, Barry -- I knew there had to be a way
Hugh